Overview
The Frederick Snow Removal Equipment Facility (SREF) was ground-up, new construction of a 7,240 square foot Pre-Engineered Metal Building to house the City of Frederick Municipal Airport’s Snow Removal Equipment. Some Architectural attributes include: Under-Slab Radiant Flooring, Epoxy coated floors, 5-Ton Overhead Bridge Crane, and 22’0″ Wide Overhead Doors.
Project Data
Owner: City of Frederick, MD
Floor Area: 7,240 GSF
Method of Award: Competitive Bid
Construction Cost: $1,412,000
Actual Duration: 360 Days
Awards: TBA